DTU Wind Energy

Description

New laboratories will take part in supporting Denmark’s strong and leading position within Green Energy. Labflex is proud to be a part of this exciting project for DTU Wind Energy.

The objective for the new laboratories is to pave the way, for new research opportunities within Wind Energy, for the globally leading institute.

The project totals more than 7.000 m2 including 3 new buildings and 3 existing buildings which are being refurbished.

Labflex is the proud supplier of the laboratory solutions including designing, producing and installing the furniture.

The solution for this project is built upon our laboratory System 10 and System 14. The systems have been customized with all-welded table frames and customized installation bridges. The furniture will also include several ventilated units including fume cupboards, walk-in fume cupboards, fume hoods and chemical cabinets.

The project has been completed in close collaboration with the laboratory users, Langvad Architects, the contractor BAM and the Danish Building and Property Agency.

FACTS

Year: 2021

Architect: Langvad Architects

Client: The Danish Building and Property Agency

Size: 1.000 m²

Laboratory type: R&D laboratories

Laboratory system: System 10 / System 14